We are now in the process of having the bathroom being rebuilt. One thing I did was take pictures of the process, especially where the blocking was put in for the grab bar and seat. This way we have pictures with measurements on where everything is if we need to do anything else, or, if we sell the new owners knows what is behind the tiles.
One of the things the contractor wanted was concrete backer board and I fully agreed with him. If water ever got through it would hold up a lot better than anything else.
At this portion you need to exercise a lot of patience. As we get one portion done it takes time for things to dry.
![]() |
Blocking for the seat |
![]() |
Blocking for the grab bar and allowance if we want to add another |
![]() |
Starting to look like a shower |
![]() |
Start of the bed of the shower |
![]() |
Membrane and the tile with the concrete board |
![]() |
Tiling the walls and the new LED overhead light |
![]() |
The non-slip floor |
![]() |
Grab bar and seat installed. Only thing we are waiting for is the glass door |
No comments:
Post a Comment